|
The coating of manufactured products by paint, metals and
resists to enhance appearance, impart engineering properties,
and provide corrosion protection, is an intensive water consuming
process.
The aggressive and toxic chemicals required to achieve
many of these finishes must be fully rinsed as the parts
are processed.
Emissions from the process tanks must be effectively extracted
and scrubbed before discharge.
Input water and replacement
air must also be conditioned to meet process and environmental
expectations.
e-RPM addresses the supply and disposal facility
needs through a rigorous approach to raw material conservation,
waste minimisation,
recycling and final waste effluent treatment in a holistic
PPC program.
Process mass balances are derived by audit
or calculated using our detailed knowledge of the wide
range of proprietary
processes offered to manufacturers and contract
surface finishers.
Turnkey installations for green field projects are
delivered, as well as additive recovery and processing
units for installations. These may
be
subject to stricter
regulation or change in process chemistry, rendering present installations
inoperative or non-conforming.
Facility conformance and control is
enhanced with e-RPM remote process monitoring and management.
|